Route finder

Which Kilimanjaro route is best for you?

There is no single best route up Kilimanjaro, only the best one for your trip. For a first climb in one week, that is usually Machame; with eight days, Lemosho. If you want huts, Marangu; in the rainy months, Rongai. Five questions sort all seven routes for yours.

Five questions

Change your answerQuestion 1 of 5How many days can you spend on the mountain?

Count the days on the trail, gate to gate. More days give your body more time to adjust to the altitude.

  • Machame: sold for 6–8 days, 7 recommended
  • Lemosho: sold for 6–9 days, 8 recommended
  • Marangu: sold for 5–6 days, 6 recommended
  • Rongai: sold for 6–8 days, 7 recommended
  • Northern Circuit: sold for 8–10 days, 9 recommended
  • Umbwe: sold for 6–7 days, 7 recommended
  • Shira: sold for 6–8 days, 7 recommended

Fewer than 6 days? Marangu is the one route usually sold as a 5-⁠day climb, and its guide recommends 6. Fees on the tiles: the lowest park fees for that many days, indicative, per person.Lowest park fees per person, indicative. Choosing an answer takes you to the next question.

Change your answerQuestion 2 of 5Have you slept at high altitude before?

Fitness does not protect you from altitude sickness. Time and a gradual climb help most.

Change your answerQuestion 3 of 5Where would you like to sleep?

Only Marangu has huts. On the other six routes, your crew pitches the tents.

Change your answerQuestion 4 of 5When are you going?

Bar height shows how good each month usually is for a climb.

January: the dry season, about 90 mm of rain in the southern forest belt; summit nights about −10 °C (−16 to −20 °C in the wind).

February: the dry season, about 100 mm of rain in the southern forest belt; summit nights about −10 °C (−16 to −20 °C in the wind).

March: between the seasons, about 200 mm of rain in the southern forest belt; summit nights about −10 °C (−16 to −20 °C in the wind).

April: the long rains, about 480 mm of rain in the southern forest belt; summit nights about −10 °C (−16 to −20 °C in the wind).

May: the long rains, about 400 mm of rain in the southern forest belt; summit nights about −10 °C (−16 to −20 °C in the wind).

June: the dry season, about 110 mm of rain in the southern forest belt; summit nights about −10 °C (−16 to −20 °C in the wind).

July: the dry season, about 70 mm of rain in the southern forest belt; summit nights about −10 °C (−16 to −20 °C in the wind). One of the busiest months on the mountain.

August: the dry season, about 60 mm of rain in the southern forest belt; summit nights about −10 °C (−16 to −20 °C in the wind). One of the busiest months on the mountain.

September: the dry season, about 45 mm of rain in the southern forest belt; summit nights about −10 °C (−16 to −20 °C in the wind).

October: the dry season, about 80 mm of rain in the southern forest belt; summit nights about −10 °C (−16 to −20 °C in the wind).

November: the short rains, about 180 mm of rain in the southern forest belt; summit nights about −10 °C (−16 to −20 °C in the wind).

December: between the seasons, about 140 mm of rain in the southern forest belt; summit nights about −10 °C (−16 to −20 °C in the wind).

Change your answerQuestion 5 of 5What else matters to you?

Pick one, both or neither.

About 40% of all climbers start on Machame, about 2% on Umbwe. The Barranco Wall is a 257 m hands-on scramble on four routes; no ropes needed.

Seven routes, one summit. Answer the questions to find the one that fits your trip.

Your answers

Select an answer to change it.

All seven routes

All seven routes, sorted for you

All of them lead to the same summit. Answer a question above and the cards sort themselves, each with its reasons.

Routes that fit all your answers come first, then those with the fewest trade-offs. Among equals: more reasons why they fit, then more nights before summit night, then the smaller one-day gain in sleeping height.

Machame

Whiskey route

6–8 days · 62 km · Tents · up the south-west, down the south

A great fit if…You want the most varied scenery you can get in about a week

5 nights before summit night · first night 3,010 m

Barranco Wall
Day 4
Share of climbers
About 40%
Summit success
~80⁠–⁠85%7-⁠day · operator estimate
Read the Machame guide

6–9 days · 67 km · Tents · up the west, down the south

A great fit if…You want plenty of time to acclimatize and a gentle start

6 nights before summit night · first night 2,780 m

Barranco Wall
Day 5
Share of climbers
Part of the western 18%
Summit success
~85⁠–⁠90%8-⁠day · operator estimate
Read the Lemosho guide

Marangu

Coca-Cola route

5–6 days · 77 km · Huts · up and down the south-east

A great fit if…You would rather sleep in a hut than in a tent

4 nights before summit night · first night 2,720 m

Barranco Wall
None
Share of climbers
Not published
Summit success
~55⁠–⁠65%6-⁠day · operator estimate
Read the Marangu guide

6–8 days · 74 km · Tents · up the north-east, down the south-east

A great fit if…You want fewer people on the way up than on Machame or Marangu

5 nights before summit night · first night 2,671 m

Barranco Wall
None
Share of climbers
About 12%
Summit success
~70⁠–⁠80%7-⁠day · operator estimate
Read the Rongai guide

Northern Circuit

The Grand Traverse

8–10 days · 88 km · Tents · up the west, down the south

A great fit if…You want the most time to acclimatize before summit night

7 nights before summit night · first night 2,780 m

Barranco Wall
None
Share of climbers
Part of the western 18%
Summit success
~85⁠–⁠90%9-⁠day · operator estimate
Read the Northern Circuit guide

6–7 days · 53 km · Tents · up the south-west, down the south

A great fit if…You have been to high altitude before and know how your body reacts

5 nights before summit night · first night 2,850 m

Barranco Wall
Day 4
Share of climbers
About 2%
Summit success
~50⁠–⁠65%6-⁠day · operator estimate
Read the Umbwe guide

6–8 days · 57 km · Tents · up the north-west, down the south

A great fit if…You arrive acclimatized: after climbing Mount Meru, after another high trek, or because you live at altitude

5 nights before summit night · first night 3,500 m

Barranco Wall
Day 4
Share of climbers
Part of the western 18%
Summit success
~70⁠–⁠80%7-⁠day · operator estimate
Read the Shira guide

Nine common situations

The best route if you…

Quick answers for the most common trips. The questions above give the same results.

…are climbing high for the first time

Lemosho starts gently, with a first night at 2,780 m, and gives you six nights before summit night, including a climb-high, sleep-low day at Lava Tower. Machame fits too in eight days; with one week, it gives you five nights and the same kind of day, but starts with +1,210 m on day one. Umbwe and Shira suit climbers who arrive acclimatized.

6
nights before summit night on Lemosho’s 8-⁠day plan
+405 m
up to the first night on Lemosho, against +1,210 m on Machame
670 m
down from Lava Tower (4,630 m) to sleep that night
Show on the map

…have one week

Machame in seven days gives you five nights before summit night and a climb-high, sleep-low day at Lava Tower. Rongai in seven days climbs from the north-east, with a steady gradient and no scrambling, but no full climb-high, sleep-low day. Expect company: about 40% of all climbers start on Machame.

5
nights before summit night in seven days
$960
park fees for 7 days on Machame (indicative, per person)
4,630 m
Lava Tower, then down to sleep 670 m lower
Show on the map

…want the most time to acclimatize

On their recommended plans, the Northern Circuit gives you the most nights before summit night, seven in nine days; Lemosho gives you six in eight and Machame five in seven. All three include a climb-high, sleep-low day. How many days you take matters more than which trail you choose.

7
nights before summit night: the Northern Circuit, 9 days
6
nights before summit night: Lemosho, 8 days
5
nights before summit night: Machame, 7 days
Show on the map

…are climbing in the rainy season

Rongai starts on the drier north side of the mountain, though its last day crosses the wetter forest above Marangu Gate. Marangu gives you a roof and a dining hall every night. April and May bring the long rains, November the short rains.

April and May
the long rains
November
the short rains
480 mm
of rain in a usual April in the southern forest belt
Show on the map

…would rather sleep in a hut

Marangu is the only route with huts: bunk huts every night, on the same trail up and down. Take six days, not five: the extra day adds a climb-high walk to Zebra Rocks (4,020 m). Summit night from Kibo Hut is as long and cold as on any route.

6
days recommended; 5 is the shortest plan sold
4,720 m
Kibo Hut, the last night before the summit
$60
hut fee per night, against $50 for camping (before VAT)
Show on the map

…want fewer other groups

The Northern Circuit has few other groups on its northern slopes. Rongai has fewer climbers than Machame or Marangu as far as Kibo Hut: about 12% start there, against 40% on Machame. Only about 2% of climbers start on Umbwe, but from Barranco Camp it joins the busy southern camps.

12%
of climbers start on Rongai
2%
of climbers start on Umbwe
40%
of climbers start on Machame
Show on the map

…arrive acclimatized, after Mount Meru or another high trek

Umbwe is the shortest route, 53 km from gate to gate, straight up a steep forest ridge with +1,250 m to the first night. Shira starts by vehicle at 3,414 m, so the summit is only 2,481 m above the start. Neither suits a first climb to altitude.

53 km
Umbwe, gate to gate
3,414 m
Shira’s start, reached by vehicle
+1,250 m
the biggest one-day gain in sleeping height on Umbwe
Show on the map

…would rather avoid the Barranco Wall

The Barranco Wall is a 257 m hands-on scramble on Machame, Lemosho, Umbwe and Shira, up a steep rock face on a well-trodden line. You need no ropes or climbing skills, and your guide shows you where to put your hands and feet. The Northern Circuit, Rongai and Marangu reach the summit with no scrambling on the way up.

257 m
of hands-on scramble
4 of 7
routes climb it
No ropes
needed: hands and feet only
Show on the map

…have only five or six days

For a first climb, Marangu in six days comes closest, though it leaves only four nights before summit night; its five-day plan leaves even less time. If you would rather camp, Machame in six days comes next. One more day changes this: with seven days, Machame fits a first climb, for about $150 more in park fees (indicative).

4
nights before summit night in 6 days
$870
park fees for 6 days on Marangu (indicative, per person)
+$150
in park fees for one more day on Machame (indicative)
Show on the map

FAQ

Choosing a Kilimanjaro route: frequently asked questions

Short answers to what people ask most before they choose a route.

All Kilimanjaro questions

Which Kilimanjaro route is the easiest?

No route is easy: every one climbs to the same summit. Underfoot, Marangu and Rongai are the gentlest, with no scrambling, and Marangu has a bed in a hut every night. But Marangu gains height quickly, and Rongai has no full climb-high, sleep-low day. For beginners, time to adjust matters most: take Lemosho (8 days) or the Northern Circuit (9).

Which route is best for acclimatization?

The Northern Circuit. Its recommended 9-⁠day plan gives you seven nights before summit night, more than any other route’s, and a climb-high, sleep-low day at Lava Tower. Lemosho gives you six in eight days and Machame five in seven, both with a climb-high, sleep-low day as well.

What are the summit success rates per route?

The park publishes no summit figures per route. Operators estimate them for each route’s standard plan: Machame ~80⁠–⁠85% (7 days), Lemosho ~85⁠–⁠90% (8), Marangu ~55⁠–⁠65% (6), Rongai ~70⁠–⁠80% (7), the Northern Circuit ~85⁠–⁠90% (9), Umbwe ~50⁠–⁠65% (6) and Shira ~70⁠–⁠80% (7). The number of days you book matters more than the route.

Which routes have fewer other groups?

The Northern Circuit has few other groups on its northern slopes. Fewer climbers start on Rongai (12%) or Umbwe (2%) than on Machame (40%), and the western routes (Lemosho, the Northern Circuit and Shira) account for 18% together. Where trails merge, camps fill up: on Rongai at Kibo Hut, on Umbwe from Barranco Camp.

Which Kilimanjaro route has huts?

Only Marangu, with bunk huts every night at Mandara Huts, Horombo Huts and Kibo Hut, up and down the same trail. On the other six routes you camp, even at sites named after a hut, such as Moir Hut and School Hut on the Northern Circuit. On Rongai, some operators book bunks at Kibo Hut before summit night.

What is the shortest route?

By distance, Umbwe: 53 km from gate to gate. By days, Marangu, sold from five days, though its guide recommends six. Shira starts highest, at 3,414 m by vehicle, so the summit is only 2,481 m above the start. Shorter routes leave less time to adjust: Umbwe and Shira suit climbers who arrive acclimatized.

What is the most popular route?

Machame: about 40% of all climbers start there, more than on any other route. Its 7-⁠day plan has a climb-high, sleep-low day at Lava Tower and the Barranco Wall on day 4. By the time it reaches Barranco Camp, groups from Lemosho, Umbwe and Shira have all joined its trail, so expect full campsites in the peak months.

Which is the hardest route?

Umbwe, rated 5 of 5 for difficulty in its route guide. Day 2 is the steepest climb from one camp to the next on any route: +1,110 m in 6 km, into Barranco Camp. None of the open routes needs climbing skills. The Western Breach, a steeper way into the crater, is closed.

Can you choose your way down?

Not freely: the way down comes with the route you book. Machame, Lemosho, the Northern Circuit, Umbwe and Shira come down the Mweka trail to Mweka Gate. Marangu and Rongai come down the Marangu trail to Marangu Gate, past Horombo Huts, sharing the trail with groups on their way up.

Sources

Shares of climbers: KINAPA, 50 years of Kilimanjaro National Park (2023); the park counts the western routes together. Park fees: TANAPA, 2026/27, indicative for a non-resident adult, incl. 18% VAT, excl. crew fees. Summit success: estimates reported by operators for each route’s standard plan; the park publishes no figures per route. “Fewer groups” and difficulty: the editorial ratings of our route guides. Months: usual conditions; rainfall for the southern forest belt. Trail lines © OpenStreetMap contributors (ODbL); elevation from SRTM (NASA).